Home » News & Blogs » Fully fuelled and under pressure
Bookmark and Share
Preparing for Liftoff

Fully fuelled and under pressure

12 Apr 2016, 13:34 UTC
Fully fuelled and under pressure
(200 words excerpt, click title or image to see full post)

Following the successful completion of the fuelling operation, the team continued with the next hazardous step: pressurizing the fuel tanks. This last step was completed and on Friday the spacecraft mated with the PAF, the interface adapter between Sentinel-1B and the ASAP-S, hosting the co-passengers.
Microscope team visits Sentinel-1B
Yesterday, the ASAP-S intermediate structure - with Microscope and Fly Your Satellite fully integrated - was moved to the final integration hall where it will be awaiting the flight-ready Fregat for mating before Sentinel-1B arrives.
Sentinel-1B, Microscope, Fly Your Satellite, Arianespace and CSG teams at BT-POC
In parallel to these activities, all three stages of the launcher have now been fully assembled. The launcher is currently undergoing pyrotechnic and electrical checks in the MIK building. This facility is also used for Fregat (Soyuz upper stage) preparation before fuelling in the Fregat Fuelling Facility (FCUBE).
This morning the ESA team went to the MIK facility to have a look at the fully assembled Soyuz launcher.
It slowly dawns on us that the launch is planned for next week!
Fly Your Satellite team
From the ESA Sentinel-1B team in Kourou.
For information about our Sentinel-1 mission visit www.esa.int/sentinel-1

Latest Vodcast

Latest Podcast

Advertise PTTU

NASA Picture of the Day

Astronomy Picture of the Day

astronomy_pod